Project

Home >> Project
580 TON PAPER PROJECT

Location: INDONESIA

Delivery time: Sep, 2025-Dec, 2025

Description:

580 TON PAPER PROJECT

PIPE: CS / SS SMLS & WELD PIPE

FITTING,FLANGE,BOLT NUT& GASKET

1/2-44 INCH

image.png

445 TON PFF PROJECT

Location: PERU

Delivery time: Jul, 2025-Dec, 2025

Description:

445 TON PFF PROJECT

PIPE:API X52N/X60M

FITTING:A234/A105

FLANGE/FIG-8 BLANK:A105

3/4-48 INCH

image.png

147 TON SS PFF PROJECT

Location: INDONESIA

Delivery time: Jul, 2025

Description:

147 TON SS PFF PROJECT

SS PIPE: A358 / A312 

SS FITTINGS: A403

SS FLANGE: A182

2-40 INCH

image.png

150 TON 3PE Pipe SHIP TO PERU

150 TON 3PE Pipe SHIP TO PERU

Location: PERU

Delivery time: Jul, 2025

Description:

150 TON 3PE Pipe SHIP TO PERU

API 5L PSL2 3PE DIN30670, 114.3*11.13mm

image.png

SQUARE TUBE & ELBOW & STUB END

SQUARE TUBE & ELBOW & STUB END

Location: SOUTH KOREA

Delivery time: May, 2025

Description:

39 TONS SQUARE TUBE & ELBOW & STUB END,

SQUARE TUBE: A500 GR.B 

ELBOW & STUB END: WP22 CL1 & 3

2-10 INCH

image.png

74 TONS FITTING & FLANGE

Location: INDONESIA

Delivery time: Nov, 2025

Description:

74 TONS FITTING & FLANGE,

WN/BL/SO FLANGE: A105 / AWWA C207

NIPPLE: MONEL B165

90DEG 1.5D ELBOW/REDUCER/TEE: A234 WPB

WELDOLET: A105

1/2-48 INCH

image.png

85 TONS SS / CS PIPE / FLANGE

Location: THAILAND

Delivery time: Apr, 2025

Description:

85 TONS SS / CS PIPE /FLANGE,

SS PIPE: A213-TP347H, 1-3 INCH

CS PIPE: A106 B, 1/2-16 INCH 

FLANGE(BL/SO/WN): EN1092-1, 2-64 INCH

image.png

Pipe / flange / anchor plate project

PFF++ package project 

Delivery time: Nov,2024-Feb, 2025

Description:

ASTM A928 S31803 DN2000 stainless steel pipe

AWWA C207 ASTM A182 F55 DN2000 WN & BL flange

ASTM A105N DN1500 & DN1350 carbon steel flange

GB/T 3091 Q355B girth weld DN2000 carbon steel pipe

ASTM A240 S32205 & 304 anchor plate


image.png


Carbon & Stainless steel pipe project

Location: INDONESIA

Delivery time: Dec, 2024-Jan,2025

Description:

CARBON & STAINLESS STEEL PIPE,

400 TONS API 5L GR.B / A53 GR.B galvanizing, 1/2-12 INCH

85 TONS  A312 TP304L & TP316, 1/2-8 INCH


image.png

680TON SMLS PIPE PROJECT

Location: INDONESIA

Delivery time: April, 2024

Description: 680TONS SMLS PIPE, ASTM API 5L GR.B / ASTM A53 GR.B / ASTM A106 GR.B, 1/2-16 INCH


75TONS ASTM A192 PIPE

Location: INDONESIA

Delivery time: April, 2024

Description: 75TONS SMLS PIPE, ASTM A192, 25.4 * 2.11 * 7.2M/PC, 25.4 * 2.11 * 5M/PC


Internal boring and external turning A333 GR.3 PIPE

Location: AUSTRALIA

Delivery time: April, 2024

Description: SMLS PIPE, ID 355.6MM, WT 57.94MM, INTERNAL BORING AND EXTERNAL TURNING, ASTM A333 GR.3 

130TON PFF PROJECT

Location: THE PHILIPPINES

Delivery time: Dec,2023

Description: 130TON PFF PROJECT

PIPE: SMLS PIPE IN ASTM A53 GALV, ASTM A106 GR.B, A335 GR.P91,  LSAW PIPE IN API 5L GR.B

FITTING: A182 F91, A403 WP304L, A234 WP91, A234 WPB, A105 FITTINGS

FLANGE: 150#, 300#, 600#, 900#, 1500# WN / SCRD / BL / SW FLANGES

48.5TON STAINLESS PFF

Location: PERU

Delivery time: Oct,2023

Description: 48.5TON STAINLESS PFF

SMLS & WELDED SS PIPE, 1-12INCH, ASTM A312 AISI 316/316L

WN FLANGE, 150#, 14-16 INCH, ASTM A182 F316/316L

ELBOW, TEE, THREADOLET, WELDOLET, ASTM A403 GR.316/316L


FF BOLT & NUT GASKET PROJECT

Location: THE PHILIPPINES

Delivery time: Sep, 2023

Description: PIPING COMPONENTS PROJECT

FITTING: THREADOLETS, ELBOW,TEE, CAP, REDUCER, REDUCING ADAPTOR, LOCK WASHER

FLANGE: WN RF

GASKET: SPIRAL WOUND GASKET

BOLT: STUD BOLT & HEAVY NUTS


125 tons SMLS PIPE / FITTING / MACHINE BOLT

Location: THAILAND

Delivery time: July, 2023

Description: SMLS PIPE, 3-12 INCH, API 5L GR.B & GR.X42

ELBOW / TEE / RED TEE / REDUCER / ELBOW HDG, ASTM A234 WPB

MACHINE BOLT WITH NUTS, ASTM A193 GR.B16, ASTM A194 GR.7


Wecha

Wechat Official Accounts

+86 150 2158 1239

E-mail:andy@jsteel-sh.com

Copyright © J STEEL All Rights Reserved | Sitemap