Location: INDONESIA
Delivery time: Sep, 2025-Dec, 2025
Description:
580 TON PAPER PROJECT
PIPE: CS / SS SMLS & WELD PIPE
FITTING,FLANGE,BOLT NUT& GASKET
1/2-44 INCH

Location: PERU
Delivery time: Jul, 2025-Dec, 2025
Description:
445 TON PFF PROJECT
PIPE:API X52N/X60M
FITTING:A234/A105
FLANGE/FIG-8 BLANK:A105
3/4-48 INCH

Location: INDONESIA
Delivery time: Jul, 2025
Description:
147 TON SS PFF PROJECT
SS PIPE: A358 / A312
SS FITTINGS: A403
SS FLANGE: A182
2-40 INCH

150 TON 3PE Pipe SHIP TO PERU
Location: PERU
Delivery time: Jul, 2025
Description:
150 TON 3PE Pipe SHIP TO PERU
API 5L PSL2 3PE DIN30670, 114.3*11.13mm

SQUARE TUBE & ELBOW & STUB END
Location: SOUTH KOREA
Delivery time: May, 2025
Description:
39 TONS SQUARE TUBE & ELBOW & STUB END,
SQUARE TUBE: A500 GR.B
ELBOW & STUB END: WP22 CL1 & 3
2-10 INCH

Location: INDONESIA
Delivery time: Nov, 2025
Description:
74 TONS FITTING & FLANGE,
WN/BL/SO FLANGE: A105 / AWWA C207
NIPPLE: MONEL B165
90DEG 1.5D ELBOW/REDUCER/TEE: A234 WPB
WELDOLET: A105
1/2-48 INCH

Location: THAILAND
Delivery time: Apr, 2025
Description:
85 TONS SS / CS PIPE /FLANGE,
SS PIPE: A213-TP347H, 1-3 INCH
CS PIPE: A106 B, 1/2-16 INCH
FLANGE(BL/SO/WN): EN1092-1, 2-64 INCH

PFF++ package project
Delivery time: Nov,2024-Feb, 2025
Description:
ASTM A928 S31803 DN2000 stainless steel pipe
AWWA C207 ASTM A182 F55 DN2000 WN & BL flange
ASTM A105N DN1500 & DN1350 carbon steel flange
GB/T 3091 Q355B girth weld DN2000 carbon steel pipe
ASTM A240 S32205 & 304 anchor plate

Location: INDONESIA
Delivery time: Dec, 2024-Jan,2025
Description:
CARBON & STAINLESS STEEL PIPE,
400 TONS API 5L GR.B / A53 GR.B galvanizing, 1/2-12 INCH
85 TONS A312 TP304L & TP316, 1/2-8 INCH

Location: INDONESIA
Delivery time: April, 2024
Description: 680TONS SMLS PIPE, ASTM API 5L GR.B / ASTM A53 GR.B / ASTM A106 GR.B, 1/2-16 INCH
Location: INDONESIA
Delivery time: April, 2024
Description: 75TONS SMLS PIPE, ASTM A192, 25.4 * 2.11 * 7.2M/PC, 25.4 * 2.11 * 5M/PC
Location: AUSTRALIA
Delivery time: April, 2024
Description: SMLS PIPE, ID 355.6MM, WT 57.94MM, INTERNAL BORING AND EXTERNAL TURNING, ASTM A333 GR.3
Location: THE PHILIPPINES
Delivery time: Dec,2023
Description: 130TON PFF PROJECT
PIPE: SMLS PIPE IN ASTM A53 GALV, ASTM A106 GR.B, A335 GR.P91, LSAW PIPE IN API 5L GR.B
FITTING: A182 F91, A403 WP304L, A234 WP91, A234 WPB, A105 FITTINGS
FLANGE: 150#, 300#, 600#, 900#, 1500# WN / SCRD / BL / SW FLANGES
Location: PERU
Delivery time: Oct,2023
Description: 48.5TON STAINLESS PFF
SMLS & WELDED SS PIPE, 1-12INCH, ASTM A312 AISI 316/316L
WN FLANGE, 150#, 14-16 INCH, ASTM A182 F316/316L
ELBOW, TEE, THREADOLET, WELDOLET, ASTM A403 GR.316/316L
Location: THE PHILIPPINES
Delivery time: Sep, 2023
Description: PIPING COMPONENTS PROJECT
FITTING: THREADOLETS, ELBOW,TEE, CAP, REDUCER, REDUCING ADAPTOR, LOCK WASHER
FLANGE: WN RF
GASKET: SPIRAL WOUND GASKET
BOLT: STUD BOLT & HEAVY NUTS
Location: THAILAND
Delivery time: July, 2023
Description: SMLS PIPE, 3-12 INCH, API 5L GR.B & GR.X42
ELBOW / TEE / RED TEE / REDUCER / ELBOW HDG, ASTM A234 WPB
MACHINE BOLT WITH NUTS, ASTM A193 GR.B16, ASTM A194 GR.7